|
|
|
IBCSG 36-07/BIG 2-06 (ALTTO)
A randomized, multi-center, open-label, phase III study of adjuvant lapatinib, trastuzumab, their sequence and their combination in patients with HER2/ErbB2 positive primary breast cancer
Adjuvant Lapatinib and/or Trastuzumab Treatment Optimization Study - ALTTO
DESIGN 1

Initiation of targeted therapy after completing all (neo) adjuvant chemotherapy
Patients will receive either trastuzumab 8 mg/kg IV loading dose followed by 6mg/kg IV every 3 weeks for 1 year (52 weeks), oral lapatinib 1500 mg daily for 1 year (52 weeks), weekly trastuzumab for 12 weeks (4 mg/kg IV loading dose followed by 2 mg/kg IV weekly) followed by a 6-week treatment-free interval followed by oral lapatinib 1500 mg daily for 34 weeks (total: 52 weeks of treatment) or oral lapatinib 1000 mg daily in combination with trastuzumab 8 mg/kg IV loading dose followed by 6mg/kg IV every 3 weeks for 1 year (52 weeks).
DESIGN 2
In patients scheduled to receive taxanes after anthracyclines and together with the targeted agents, paclitaxel will be administered concomitantly with the targeted therapy and according to a weekly schedule (80mg/m2 IV for 12 weeks). When dosed concomitantly with paclitaxel, the weekly schedule of trastuzumab will be used (4 mg/kg IV loading dose followed by 2 mg/kg IV weekly). After completion of paclitaxel, trastuzumab will revert to the three-weekly schedule (6 mg/kg without loading dose) and radiotherapy will be started, if indicated. Docetaxel may become an option pending the results of ongoing safety studies in combination with lapatinib.
|
Study Chairs BrEAST: Dr. Martine Piccart - Brussels, Belgium NCCTG: Dr. Edith Perez - Jacksonville, USA
Statistician Prof. Richard Gelber
Trial Monitor Margit Bachmann IBCSG Coordinating Center, Bern, Switzerland Phone: +41 31 389 93 91 Fax: +41 31 389 93 92 Email: altto@ibcsg.org
Date of Activation April 11, 2007
Targeted Accrual 8000 patients
News
01.02.2010:
The impact of peritumoral vascular invasion on outcome in IBCSG Trials VIII and IX
27.01.2010:
First issue of SOLE flash, the short newsletter for IBCSG 35-07 SOLE
11.01.2010:
The latest information about the IBCSG Annual Meeting 2010 is available online.
All News
|
|